hardeep@wrmseals.com / pssoni@soni.co.in +91 98200-64848 / +91 98300-77664
ISO 9001:2015 Celebrating 50 Years WRAS / NSF / UKAS Approved

Pipe Assembly & Applications

Ensuring leak-free municipal oPVC, water, and sewage pipeline installation.

General Application

Sealing oPVC Networks Across the Globe

PVC and oPVC pipes are used in the construction of vast networks of water and sewer piping systems around the world. It is essential that these pipes convey various fluids without leakage through joints, while preventing external materials such as ground water (inflow/infiltration) and soils from migrating into the pipe through faulty joints.

The **WRM Pressure Lock Seal** makes this joining process possible while ensuring seal integrity for the full system life. The seal is incorporated into the pipe by the oPVC pipe manufacturer, allowing installers to join pipes at the site easily and securely without incorrect seal fitment.

Pipeline Trench
Standard Procedure

Pipe Assembly Instructions

Follow these 4 critical steps for secure oPVC jointing.

1
Chamfer Spigot

Chamfer the spigot end at a 12° to 15° angle to ensure smooth insertion into the socket without displacing the rubber ring.

2
Clean Socket

Thoroughly clean the socket bell and inspect the pre-locked pressure seal to ensure no sand, grit, or debris is present.

3
Apply Lubricant

Apply a non-solvent based lubricant uniformly to the chamfered spigot end before assembly to minimize insertion friction.

4
Push & Lay

Slide the spigot into the socket, compressing the sealing lip. Always lay pipes in accordance with applicable engineering standards.